fxhedge

CFH-USD-3 Over-hedged tranche

Active

Designation

Currency
USD (Sell foreign)
Hedged risk
Forward rate (full forward)
Designated on
May 19, 2026
Hedged notional
510,000 maturing about April 9, 2027
Hypothetical derivative rate
87.3143 (spot at designation 85.2542)
Instrument notional
600,000 (hedge ratio 117.6%)

Instruments

  • FWD-07 SELL 600,000 @ 87.0640, Feb. 23, 2027 (Open)

Hedged exposures

  • Forecast sale FC-USD-05 USD 620,000 due March 25, 2027
  • Forecast sale FC-USD-06 USD 606,800 due April 24, 2027

Documentation

Risk management objective: protect INR value of USD export collections against USD/INR depreciation. Hedged item: highly probable forecast USD sales. Instrument: INR/USD forward sale. Effectiveness: economic relationship by critical-terms match, dollar-offset 80-125%, hypothetical derivative method. Note: instrument notional exceeds hedged forecast.

Latest test (Sept. 30, 2026)

Cumulative dollar offset
116.2% within 80-125%
Regression slope / R²
1.178 / 1.000
OCI reserve
462,879.33
Cumulative ineffectiveness (P&L)
75,097.48

Effectiveness test history

Period endInstrument changeHypothetical changeOffset (period)Cum. instrumentCum. hypotheticalOffset (cum.)SlopeR²OCI reserveOCI movementP&L ineffectiveness
July 31, 2026-637,894-541,093117.9% -637,894-541,093117.9% -- -541,093-541,093-96,801
Aug. 31, 2026797,306675,311118.1% 159,412134,218118.8% -- 134,218675,311121,995
Sept. 30, 2026378,565328,661115.2% 537,977462,879116.2% 1.1781.000 462,879328,66149,904

Dollar offset = change in hedging instrument / change in hypothetical derivative; the 80-125% band is a reference. The OCI reserve is the lesser (in absolute terms) of the cumulative instrument change and the cumulative hypothetical derivative change; the excess is cumulative P&L ineffectiveness.

Hedged transaction realised

Releases the reserve at the last locked period and completes the relationship.