fxhedge

CFH-USD-2 Spot-element hedge

Active

Designation

Currency
USD (Sell foreign)
Hedged risk
Spot element only, forward element in cost of hedging
Designated on
April 27, 2026
Hedged notional
800,000 maturing about Feb. 8, 2027
Hypothetical derivative rate
86.8001 (spot at designation 85.0095)
Instrument notional
800,000 (hedge ratio 100.0%)

Instruments

  • FWD-05 SELL 800,000 @ 86.2787, Dec. 4, 2026 (Open)

Hedged exposures

  • Forecast sale FC-USD-03 USD 642,200 due Jan. 24, 2027
  • Forecast sale FC-USD-04 USD 631,800 due Feb. 23, 2027

Documentation

Risk management objective: protect INR value of USD export collections against USD/INR depreciation. Hedged item: highly probable forecast USD sales. Instrument: INR/USD spot element; forward points in cost of hedging sale. Effectiveness: economic relationship by critical-terms match, dollar-offset 80-125%, hypothetical derivative method.

Latest test (Sept. 30, 2026)

Cumulative dollar offset
100.0% within 80-125%
Regression slope / R²
1.000 / 1.000
OCI reserve
-190,640.00
Cumulative ineffectiveness (P&L)
0.00

Effectiveness test history

Period endInstrument changeHypothetical changeOffset (period)Cum. instrumentCum. hypotheticalOffset (cum.)SlopeR²OCI reserveOCI movementP&L ineffectiveness
July 31, 2026-1,466,800-1,466,800100.0% -1,466,800-1,466,800100.0% -- -1,466,800-1,466,8000
Aug. 31, 2026916,640916,640100.0% -550,160-550,160100.0% -- -550,160916,6400
Sept. 30, 2026359,520359,520100.0% -190,640-190,640100.0% 1.0001.000 -190,640359,5200

Dollar offset = change in hedging instrument / change in hypothetical derivative; the 80-125% band is a reference. The OCI reserve is the lesser (in absolute terms) of the cumulative instrument change and the cumulative hypothetical derivative change; the excess is cumulative P&L ineffectiveness.

Hedged transaction realised

Releases the reserve at the last locked period and completes the relationship.