fxhedge

CFH-USD-1 Forecast sales H1

Active

Designation

Currency
USD (Sell foreign)
Hedged risk
Forward rate (full forward)
Designated on
July 8, 2026
Hedged notional
750,000 maturing about Dec. 10, 2026
Hypothetical derivative rate
87.0145 (spot at designation 86.1134)
Instrument notional
750,000 (hedge ratio 100.0%)

Instruments

  • FWD-08 SELL 750,000 @ 87.3997, Feb. 12, 2027 (Open)

Hedged exposures

  • Forecast sale FC-USD-01 USD 658,800 due Nov. 25, 2026
  • Forecast sale FC-USD-02 USD 651,200 due Dec. 25, 2026

Documentation

Risk management objective: protect INR value of USD export collections against USD/INR depreciation. Hedged item: highly probable forecast USD sales. Instrument: INR/USD forward sale. Effectiveness: economic relationship by critical-terms match, dollar-offset 80-125%, hypothetical derivative method.

Latest test (Sept. 30, 2026)

Cumulative dollar offset
101.9% within 80-125%
Regression slope / R²
0.991 / 1.000
OCI reserve
1,031,962.60
Cumulative ineffectiveness (P&L)
19,524.21

Effectiveness test history

Period endInstrument changeHypothetical changeOffset (period)Cum. instrumentCum. hypotheticalOffset (cum.)SlopeR²OCI reserveOCI movementP&L ineffectiveness
July 31, 2026-418,695-430,94697.2% -418,695-430,94697.2% -- -418,695-418,6950
Aug. 31, 2026994,722995,211100.0% 576,028564,264102.1% -- 564,264982,95911,763
Sept. 30, 2026475,459467,698101.7% 1,051,4871,031,963101.9% 0.9911.000 1,031,963467,6987,761

Dollar offset = change in hedging instrument / change in hypothetical derivative; the 80-125% band is a reference. The OCI reserve is the lesser (in absolute terms) of the cumulative instrument change and the cumulative hypothetical derivative change; the excess is cumulative P&L ineffectiveness.

Hedged transaction realised

Releases the reserve at the last locked period and completes the relationship.