P010 Classic Table 2
Revenue1,451,065
Direct margin427,664
Activity cost200,712
ABC profit226,952 (15.6%)
Traditional profit64,174
over-charged Traditional costing assigns 363,490 of overhead from 12,996 labour hours; ABC assigns 200,712.
Profit waterfall
Activity costs
| Activity | Cost | Share |
|---|---|---|
| Machine run | 91,851 | 46% |
| Hand assembly | 39,732 | 20% |
| Quality inspection | 34,507 | 17% |
| Setups | 33,149 | 17% |
| Engineering changes | 1,473 | 1% |